Snagging and handover after a build

The last few percent of a building project is where many disagreements start. A calm, organised handover makes it much more likely that everything gets finished to a standard you are happy with.

What snagging means

Snagging is the process of going through a finished job and listing the small defects or unfinished items that need putting right. Typical items include paint touch-ups, gaps in sealant, doors that rub, sockets that sit crooked, scratched glass and tiles that are not quite level. A snag is usually minor, but a long list can add up to a job that feels unfinished.

Do it in good light, with time

Set aside a proper hour or two, preferably in daylight, and go room by room. Look along walls and ceilings from an angle to see unevenness. Open and close every window and door, run every tap, flush every toilet, switch on every light and test every socket. Take photos and write things down as you go.

Agree the list together

Walk round with the builder if you can, so that the list is agreed rather than argued about afterwards. A reasonable builder would rather deal with a clear list in one go than with a stream of messages. Agree on a date by which the items will be put right.

Do not confuse snags with changes

A snag is something that is not as specified. A change is something you decided you would prefer once you saw it. Both are fair to raise, but the second is a variation and may cost extra. Being clear about the difference avoids tension at the end.

Paperwork to ask for

For work that needed Building Regulations approval, ask for the completion certificate from building control once the final inspection is done. For electrical work, ask for the relevant electrical certificate, and for gas or heating work, the relevant safety documentation. Keep guarantees and manuals for any fitted appliances, windows and other products. This paperwork matters when you come to sell the house.

Final payment

A common and sensible approach is to hold back a final payment until the snagging items are complete, as long as that has been agreed in the contract or quote beforehand. Check your payment schedule and discuss what the final stage looks like before work starts, so that nobody is surprised at the end.

Settling and cracking

New plaster and new building work move slightly as they dry and settle. Fine hairline cracks at the joint between old and new work in the first months are not unusual. Mention anything that looks worrying and ask what is expected, but do not panic over a hairline crack at a junction.

Look at the things you cannot easily see later

Before the builder leaves, find out where pipes, cables and any structural steel run, and ask for photographs of anything that has been boxed in or closed up. Check that you have spare tiles, paint and any spare parts that were left over. Know where the stopcock, consumer unit and any new isolators are, and how to operate new heating controls. These small things are easy to ask for on the day and much harder to chase months later.

Afterwards

Keep a folder with the drawings, certificates, quote, variations and photos of the work before it was closed up. A few months later, when you are wondering where a pipe runs before hanging a shelf, you will be glad of it. If something shows up after handover, contact the builder promptly and in writing rather than letting it sit.

Related pages

Free site visit and quote

Tell us about the project at hello@sandwichbuilders.co.uk or on WhatsApp. We'll arrange a site visit to give you a proper quote.

Tell us what you're planning. We'll tell you what it takes.

Free, no-obligation site visit and quote. Describe the project, send photos of the space if you can, and we'll arrange a visit to scope it properly.