Party wall basics for shared walls

Plenty of homes in Sandwich, Deal and the nearby villages share a wall, a chimney breast or a boundary with next door. If your project touches any of those, there is a legal process to know about before the first day on site.

What the Party Wall etc. Act 1996 is for

The Act sets out a process for certain types of building work close to or on a shared wall or boundary. It exists to protect both sides: you get a clear route to do your work, and your neighbour gets notice and a fair chance to respond before anything is cut, dug or built.

It is separate from planning permission and from Building Regulations. Having one does not remove the need to consider the others, and the Act applies even when no planning application is needed at all.

When it is likely to apply

Typical triggers include cutting into a shared wall to insert a beam, raising or demolishing a shared wall, building a new wall right on the boundary line, and digging foundations close to a neighbouring building and deeper than their foundations. A loft conversion in a terrace often involves beams bearing on the shared wall, so it is a common example. A simple internal refit that never touches a shared wall usually does not trigger the Act.

The exact wording of the Act matters here, and your situation may sit on the line. If in doubt, ask a party wall surveyor or check the government's explanatory booklet before assuming either way.

Notice periods

For work to a party structure, the notice is a party structure notice and must be served at least two months before the work starts. For excavation near a neighbouring building, or building a new wall at the boundary, the notice period is one month. Notices must be in writing and served properly, and the owner doing the work is the one responsible for serving them.

What your neighbour can do

After receiving a notice, a neighbour can consent in writing, or dissent. If they dissent, or do not reply within the time allowed, a dispute is treated as having arisen and surveyors are appointed to settle an award, which is a written document setting out how the work will be done and when. It is also common, and sensible for both sides, to record the condition of the neighbouring property before work starts.

Who pays

As a general rule the person starting the work pays for the notices and for the surveyor to look after the interests of the adjoining owner, where one is appointed. There are exceptions and the detail depends on the situation, so do not assume. Ask a surveyor to explain the position for your project before you agree anything.

Keeping it friendly

The process works much better if your neighbour hears about the plan from you first, ideally with a sketch, rather than from a formal letter landing on the doormat. Explain what will happen, roughly when, the likely noise and dust, and the hours of work. Most disputes start with surprise, not with the building itself.

Things that are easy to get wrong

Three mistakes come up again and again. The first is starting work before the notice period has run, which can give the neighbour grounds to seek to stop the work, and makes for a very awkward conversation. The second is assuming that because a neighbour is friendly, nothing needs to be in writing. A verbal yes is easily forgotten, and houses change hands. The third is forgetting that the Act can apply to work that does not need planning permission. If you are unsure whether your plan counts, a short conversation with a party wall surveyor before you fix a start date is cheap compared with a delayed or stopped job.

What we do at site visit stage

When we visit, we will point out whether your plan is likely to involve a shared wall or boundary, and tell you honestly if we think notices will be needed. We are not party wall surveyors and cannot act for you or your neighbour in the process, but we can plan the build around the notice periods so the timeline you are given is a realistic one.

Related pages

Free site visit and quote

Tell us about the project at hello@sandwichbuilders.co.uk or on WhatsApp. We'll arrange a site visit to give you a proper quote.

Tell us what you're planning. We'll tell you what it takes.

Free, no-obligation site visit and quote. Describe the project, send photos of the space if you can, and we'll arrange a visit to scope it properly.